Province | Subbasin | % |
---|---|---|
Columbia Cascade | Okanogan | 100.00% |
Previous: | Next: |
---|---|
n/a |
* Expenditures data includes accruals and are based on data through 31-Mar-2025.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Linda Hermeston | Bonneville Power Administration | Yes | COR | llhermeston@bpa.gov | (503) 230-4764 |
Peter Lofy | Bonneville Power Administration | Yes | F&W Approver | ptlofy@bpa.gov | (503) 230-4193 |
Christine Read | Bonneville Power Administration | Yes | Contracting Officer | clread@bpa.gov | (503) 230-5321 |
A | 22683 | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | $0 | 02/16/2007 | 03/02/2007 | |
B | 22686 | 119 | Manage and Administer Projects | Manage and Administer Value Engineering Review | Manage Contract. The Contractor shall furnish sufficient technical, supervisory and administrative personnel to insure the expeditious accomplishment of the work specified in the Scope of Work. | $0 | 02/05/2007 | 02/16/2007 | |
C | 22687 | 122 | Provide Technical Review and Recommendation | Provide Alternative Design and Specification | The VE team shall use the industry standard VE methodology. This effort shall include study of drawings, specifications, and cost data. The VE study shall develop alternative designs to achieve the required mission(s) or function(s) at the lowest overall cost consistent with performance for structures, structure or facility siting, site development, equipment, electrical systems, and materials or methods. The study may include examination of the life cycle cost, anticipated construction time, and conservation of energy. Design details and analysis will be considered and alternatives developed, as appropriate. The VE team should consider the latest technology in development of alternatives to achieve maximum results for life cycle cost, energy conservation, functional use, and first cost (construction) savings. The study shall not include any previously agreed to program elements such as rearing protocol, location of facilities, bio-program, or basin rearing objectives. Only the engineering design to accomplish the stated goals will be a part of this VE effort. | $0 | |||
D | 22690 | 141 | Produce Other Reports | Produce VE Report | Produce a complete VE report | $0 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Manage and Administer Value Engineering Review | B: 119. Manage and Administer Value Engineering Review | |||
Provide Alternative Design and Specification | C: 122. Provide Alternative Design and Specification | |||
Produce VE Report | D: 141. Produce VE Report |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 02/09/2007 | ||||||
B | 119 | Manage and Administer Value Engineering Review | 02/09/2007 | ||||||
C | 122 | Provide Alternative Design and Specification | 02/09/2007 | ||||||
D | 141 | Produce VE Report | 02/09/2007 |